BOILER COLD START UP PROCEDURE
- Ensure DM water storage tank level
normal and healthy condition of WTP for adequate water
- Ensure availability of fuel quantity and
power supply with DG backup.
- Ensure trial runs (healthiness) of all
equipment including fuel handling, ash handling / auxiliaries, motorized
valves, actuators, control valves and PRDS controls are completed
successfully.
- Ensure that all interlocks / protection
and controls are checked & taken in line.
- Ensure expansion points are cleaned
& tramps are in good condition.
- Ensure Boiler manholes and flue gas path
system manholes are boxed up.
- Ensure availability of chemical dosing
system and readiness of drum level gauge glass with illuminator assembly.
- Ensure availability of cooling water,
instrument air and service air.
- Start the ACW pump, Instrument Air &
Service Air Compressor.
- Ensure all rotary air lock valves of
modular bank hopper and economizer hopper gates are opened and then start
RAVs.
- Ensure healthiness of all dampers and
keep them in open/close marked positions as and when required.
- Open all air releases/vent valves in
boiler drum and open super heater header drains and its vent valves.
- Ensure all boiler bottom ring header
drains, blow down valves and main steam stop valves including its bypass
valves are closed.
- Ensure Deaerator level normal. If level
is low, make it normal through control valve by DM transfer pump.
- Ensure oil level of bearings normal,
minimum recirculation, balancing leak off valves & suction valves
open, cooling water pressure normal.
- Ensure sufficient suction pressure &
suction differential pressure across strainer is normal.
- Start BFP from control room. Ensure
suction pressure, balancing pressure & discharge pressure normal.
Bearing temperature & Vibrations normal. Ensure motor draws current
normal & sound normal. Shut the BFP immediately if any abnormal
condition and check thoroughly before restart.
- Start water filling the boiler drum
through 30 % control valve and maintain the drum level up to 30%.
- Start the Ash handling plant prior to
light up the Boiler. Then start all hoppers RAV.
- Charge the hopper heaters, Insulator
heaters of ESP prior to Boiler light up.
- Start the purge air blower, collecting
& emitting rapping motors prior to boiler light up.
- Stack fire wood / baled bagasse inside
the furnace for light up, put the fire and maintain the moderate
temperature of furnace without fan by keeping suction damper & discharge
damper of ID fan open.
- Spread the fire throughout the furnace.
- Raise the furnace temperature up to 150
°C to 250 °C.
- After ensure the furnace temperature of
250 deg C, start ID, FD & SA. And maintain the furnace draft -2 to -10
mmwc, FD air discharge pressure by maintaining the rpm in the range of 10
to 15 %, SA air discharge pressure by maintaining the rpm in the range of
40 to 45 % with feedback of field supervisor.
- Start screw feeder and then drum feeder
including fuel feeding system (Fuel Handling System) and slowly rise the
furnace temp by feeding fuel (maintaining the rpm of screw feeder and drum
feeder in 20 % & 10 % respectively)
- Maintain the steam drum level and if
exceeds, maintain the level by giving IBD.
- When drum pressure rises to 2-3 kg/cm2,
close the drum air vents.
- When drum pressure raises 5 kg/cm2,
close all super heater vents, drains except secondary super heater outlet
header vent & drain valves in crack opened condition. Open start up
vent valve (5%) initially and increase the start up vent valve opening
gradually according to steam pressure & temperature as per start up
curve to allow the steam flow through SH.
- At drum pressure of 5 kg/cm2, quickly
give the blow down through IBD and furnace bottom ring header for 3
minutes.
- Start HP & LP dosing and maintain
recommended drum water parameters of boiler. Keep the CBD at minimum
opening to maintain recommended residual PO4 & conductivity of drum
water.
- Check & record thermal expansion of
boiler pressure parts and record the bearings temperature & vibrations
of auxiliary equipment’s associated with Boiler.
- Start & Stop the traveling grate as
per requirement during light up and
- Ensure sub merge belt conveyor for
bottom ash disposal is in running condition.
- Follow the cold start up curve and raise
the pressure & temperature of Boiler as per
the curve. Start another ID, FD & SA fan and
BFP as per requirement.
- When boiler raises above pressure of 60
kg/cm2 & 350 deg C, charge the main steam line. Before charging the
main steam line, open all the drains at 100 % and warm up vents at minimum
opening and then open the MSSV bypass valve.
- After ensured all condensate removed
& colorless steam comes through drains, keep all the drains in crack
position, then open main steam stop valve and close the bypass steam
valve.
- Charge the PRDS of pegging steam and
charge the Deaerator. Maintain the PRDS pressure at 1.5 kg/cm2 and
temperature at 120 deg C.
- After getting the start permissive of
ESP, charge the ESP.
- Observe seal air pressure, conveying air
vessel pressure of AHP is normal.
BOILER WARM START UP PROCEDURE
- Start the DG set
- Keep the boiler in hot box up.
- Maintain the drum level accordingly.
- After this give clearance to start the
boiler.
- Start the ash handling system
accordingly
- Ensure the de-aerator level.
- Start ACW & compressor.
- Start & regulate ID, FD & SA
fans as per furnace draft.
- Start fuel handling system.
- Open start-up vent.
- Start boiler feed pump.
- Take fuel to boiler & Raise the
pressure and temperature gradually warm start-up curve.
- After reaching the pressure 25 kg/cm2
give blow down through ring headers.
- After reaching the pressure 40 kg/cm2
and temperature 350deg c, open MSSV by pass valve and warm up the line up
to TSSV.
- Give clearance for vacuum pulling.
- Slowly raise the pressure to 105 kg/cm2
and temperature to 540 deg C.
BOILER COLD START UP PROCEDURE
- Check the availability of import power
and start DG set.
- Check the reason for tripping and after
the analysis give the clearance to start the boiler.
- Close the MSSV and keep boiler in hot
box up.
- Start the ACW and compressor.
- Start the boilers feed pumps and
maintain the drum level.
- Start the ash handling system.
- Observe seal air pressure, conveying air
vessel pressure of AHP is normal.
- Start ID, FD, SA fans as per the
requirements.
- Start the fuel feeding system and
monitor the combustion feedback continuously.
- After reaching the pressure 40 kg/cm2
and temperature 350deg c, open MSSV by pass valve and warm up the line up
to TSSV.
- Open the MSSV main valve.
- Raise the pressure and temperature up to
105kg/cm2 & 545 deg C.
- Give the clearance for rolling of the
turbine.
Read Steam turbine start up procedure
Read Boiler Alkali Boil out procedure
Questions & Answers on Ash Handling Plant
How much diesel oil is needed to start the boiler in cold state?
ReplyDeleteHot Box procedure
ReplyDelete