Turbine cold start up procedure
·
Check all
turbine interlocks and protection of turbine.
·
Ensure MOT
level normal.
·
Ensure DP
across the Lube oil and Control oil filter is normal.
·
Start AOP and
fill up the overhead tank up to normal level. Put the EOP in Auto
mode. Maintain the oil temperature within the range of 40 to
45 deg C by MOT heater on, if required. Cut off the MOT heater manually after
getting 40 deg C. (Note: The minimum oil temperature for turbine start up is 25
deg C as per OEM manual). Keep stand by AOP in auto made.
·
After getting
the above said temperature, start Vapour Extractor fan then start JOP. Ensure
its normal discharge pressure i.e. 150 kg/cm2.
·
Put the TG on
barring gear and at this speed, record vibrations & temperature at all
bearing points.
·
Ensure TG
runs on barring gear at least 1 hour prior to rolling. (Note: Prior to start up
the steam turbine, the turning gear is operating for at least 25 minutes as per
OEM manual).
- Ensure hot well level normal i.e. 850
mmwc. Start CEP and put the system in recirculation mode. If required,
make up the hot well level normal by make up
- Control valve from surge tank. Put stand
by CEP in auto mode. Keep Hot well control in auto mode.
- Ensure cooling tower fore bay water
level normal i.e. 60% and start MCW pump to circulate the cooling water
through the condenser. Ensure l/L, O/L valve of condenser and l/L valve of
cooling tower opened before MCW pump starts.
- Adjust the I/L valve of cooling tower in
such a way that, CW flow should not beyond the design value.
- Open all the drain 100 % of main steam
line and keep warm up vent in minimum position and open MSSV bypass valve
fully at main steam pressure of 60 kg/cm2 & temperature of 350 deg C.
- After ensured all condensate removed
& colorless steam comes through drains, keep all the drains in crack
position, then open main steam stop valve and close the by pass steam
valve.
- Charge the PRDS of Ejector and gland
sealing PRDS line; ensure ejector pressure is of 10 kg/cm2 and temperature
of 325 deg C. Adjust the HP & LP side gland sealing pressure at 1.1
ata. Maintain the sealing steam temperature of 393 deg C at HP side and
temperature of 250 deg C at LP side.
- Prior to pulling the vacuum, ensure
vacuum breaker valve is closed. Then pull the vacuum through hugger ejector.
- After getting vacuum -0.7 kg/cm2 through
hugger ejector, take the main ejector into service and keep both the
ejector in parallel and ensure the vacuum of - 0.93 kg/cm2 through running
ejector, keep the main ejector in running and slowly close hogger ejector
air line and then close the steam line after ensuring vacuum stable after
STG synchronized only.
- Ensure the Steam pressure at TG I/L is
above 70 kg/cm2 (Alarm at 65 kg/cm2, Tripping at 52 kg/cm2), steam
temperature at TG l/L is above 420 deg C (Alarm at 395 deg C, Tripping at
385 deg C), vacuum is above -0.7 kg/cm2 (Alarm at - 0.65 kg/cm2, Tripping
at -0.5 kg/cm2). Acknowledge all the alarm in the annunciation panel/DCS
and ensure all parameters are in healthy condition. Then reset the ESV of
turbine through DCS to proceed for the rolling.
- Ensure ESV opened & control valves
are at zero position after reset the ESV. Give run command in Woodward
505E and observe the speeding should be carried out according to start up
curve, respecting the preceding standstill (soaking) time
(thermal condition of turbine).
- At every soaking period, record/check
all the critical parameters with respect to speed as follows:
1.
Oil pressure
& temperature
2.
Bearing metal
temperature
3.
Main stream
pressure & temperature
4.
Exhaust steam
pressure & temperature
5.
Axial
displacement
6.
Vibrations
What do you mean by turbo supervisory system???
- Ensure barring gear motor is switched
off in auto as per interlock
- If the oil temperature after oil cooler gets near to 48 deg C, adjust the cooling water O/L valve to maintain the oil temperature 49 deg C by keeping its I/L valve full open and ensure oil temperature should not below the 45 deg C.
- If we prefer the rolling in manual,
follow the start up curves and raise the speed as per start up curves and
record above mentioned parameters at every soaking period Note: Cross the
Critical Speed range as fast as possible.
- Keep exhaust hood spray in auto mode.
(Note: Do not allow exhaust steam temperature to exceed 105 deg C. Load
Turbine or shut it off in case temperature keeps increasing.)
- Start synchronizing by excitation on and
voltage build up, match the DG voltage and frequency with generator
voltage and frequency. When frequency and voltage matches within tolerable
limit and synchroscope LED glows and allow to close the breaker. Close the
breaker and increase the load on TG as per load curve (i.e. Approximately
2% of its rated load in order to avoid the activation of reverse power
relay) up to the rated load by pushing the corresponding keys on the
WOODWARD GOVERNOR
- Adjust the Generator Air Cooler cooling
water O/L valve to maintain the ‘Generator winding temperature by keeping
its I/L valve full open.
- Close all the main steam line drains and
vents.
- Start Remaining MCW pump and CT fan one
by one to maintain the vacuum and exhaust temperature.
- As per interlocks, after getting the
steam flow of 60 TPH or more than 60 TPH at TG I/L, QC NRV of both bleeds
of 22 ata & 9 ata respectively and control extraction of 3 ata will be
reset.
- Charge the Deaerator through control
Extraction and ensure Deaerator pressure reaches at 1.5 kg/cm2 &
temperature at 100 deg C at least.
- Charge both the HP heaters and ensure
Feed Water is charged through HP heaters prior to charge steam side.
TURBINE WARM START UP PROCEDURE
When after a
clearly detected tripping the causes is eliminated or when the turbine is
shutdown intentionally, observe the following for standstill’s longer than 5
minutes up to max. 8 hours
Refer the
Warm Startup Curve given by OEM
- Keep the live steam line up to the
emergency stop valve pressurized and gland steam open unless turbine rests
far longer than 60 minutes
- Pre-warming
the control valve block is not required
- Open turbine drain(live steam)
- The oil unit remains in full operation:
the turbine oil should not be cooled below 45 deg C
- Keep the turning gear in permanent
operation
- In case of no-uniform cooling-down
process of turbine and rotor or drop out of turning gear (in this case
immediately all isolation valves and steam to the labyrinths), slight
distortion may arise, probably within the design clearances. This occurs
especially with turbine arrangements where the turbine is exposed to an
air draft.
- In the case of a failure of turning gear
motor or fall-out loss of electric power turn manually the turbine shaft
by means of turning gear hand wheel each 5 minutes of must be turned
manually at least 2 turns. If turning unexpectedly is not possible, at all
circumstances do not apply undue force but let the turbine cool down.
- Observe the instructions given &
check for smooth action of the turbine at speed increase when starting
again. Only a completely uniform warmed up turbine rotor is in straight
condition so that further acceleration may take place without any risk.
SOP FOR TURBINE HOT START UP
Refer the Hot
Startup Curve given by OEM
- Check the availability of import power
and start DG set.
- Open the warm up vent and chest drains.
- Start AOP, MCW & CEP pumps.
- Maintain the hot well level 50% through
make up
- Close the Vaccum breaker valve and
restart the Vaccum pulling.
- Keep the barring gear motor in auto.
- Maintain the lube oil temperature 45 deg
C.
- Check the overhead tank healthy
condition.
- Check the availability of Vaccum, main
steam pressure and temperature.
- Inform to higher officials about all
parameters in healthy condition for rolling.
- Reset the turbine and give for rolling.
- Check the vibrations, bearing
temperature and any abnormalities.
- After turbine attend 6800 RPM give
clearance for synchronization.
Read Boiler start up SOP