POWER PLANT EQUIPMENT LONG SHUTDOWN
PRESERVATION METHODS
|
||
SL NO.
|
EQUIPMENT
|
PRESERVATION
METHOD
|
A
|
MECHANICAL
|
|
1
|
Boiler
|
1-Wet preservation (If shutdown
period is up to one month)
Maintain pH: 10-10.5 Hydrazine concentration :> 200 ppm Note: Check water sample at various locations like steam drum, mud drum, super heater, economiser & Water wall tubes. Concentration should be same at all collection points 2-Dry Preservation (If shutdown period is more than one month) |
2
|
Deaerator & Surge tanks
|
Wet preservation
Maintain pH: 10-10.5 Hydrazine concentration :>200 ppm |
3
|
Travelling grate (TG)
|
After cleaning, inspection &
Maintenance, keep run TG at least 10-15 minutes on every 6-7 days to avoid
shaft jam in bush/bearings
|
4
|
ESP
|
After cleaning & Inspection,
close all the man hole doors air tight & keep lime trays at various
locations to avoid moisture accumulation on internals
|
5
|
APH & Economiser
|
After cleaning & Inspection,
close all man hole doors air tight & keep lime trays at various locations
to avoid moisture accumulation on internals
|
6
|
Boiler fans
|
After cleaning &
Inspection..close all man hole doors air tight
Change the shaft orientation at every 10-12 days by rotating shaft manually to avoid shaft sagging/bending |
7
|
Boiler feed pumps
|
Keep suction valve open
Change the shaft orientation at every 10-12 days by rotating shaft manually to avoid shaft sagging/bending |
8
|
Air Compressors
|
Operate Air compressors at least
10-15 minutes at every 7-8 days or else rotate the flywheel one complete
rotation
|
9
|
Main & Auxiliary cooling water
pump
|
Rotate the shaft on every 10-15 days
to avoid impeller jam in wear ring
|
10
|
Steam Turbine
|
1-Turbine dehumidification by blowing
hot air through Turbine HP suction to LP suction & ensure relative
humidity in Turbine is <40%
2-Put turbine on barring gear for 20-30 minutes at every 6-7 days 3-Operate HP & LP valves from 0 to 100% at every 15 days 4-Operate ESV at every 30 days (Once in a month) |
11
|
Turbine lub oil system
|
Keep "ON" oil centrifuge at
least twice in a week
|
12
|
Ash handling system
|
Ensure all ash handling & storage
systems are clean to avoid rusting/corrosion
|
13
|
Fuel feeding system
|
Maintain fuel feeding system
internals clean to avoid corrosion & rusting
|
B
|
E&I
|
|
1
|
Generator
|
Keep "ON" Generator space
heaters for 8-10 hours if atmosphere temperature is very less (In rain &
winter seasons)
|
2
|
Power Transformer
|
Charge transformers at least 6-8
hours at every week to avoid moisture formation in oil
|
3
|
VFD drives
|
Keep charged all VFD drives
continuously
Note: Avoid interruption of power supply to VFDs |
4
|
Batteries
|
Inspect battery voltages regularly
(twice in a month)
|
5
|
UPS & AVR
|
Check Healthiness of redundancy
systems regularly
|
6
|
Motors
|
1-Cover all motors terminals by
polythene covers to avoid entry of rain water
2-For higher KW motor keep "ON" space heaters |
7
|
MCC & PCC
|
Keep lime trays at MCC, PCC to avoid
moisture formation
|
8
|
DCS
|
Ensure DCS healthiness regularly
Note: If DCS kept OFF, inspect the panels regularly to ensure rats/lizards are not entering into the panels |
C
|
WTP
|
|
1
|
RO plant
|
Preserve RO membranes with 2-3% SMBS
or other chemical for 30-40 days. After that drain the preserved water & perform membrane
flushing on every 7-8 days
|
2
|
Cooling tower
|
If CT is not necessary in shutdown,
drain the cooling tower ,clean the sumps & apply lime
|
3
|
Cat ion & Anion Resin
|
Maintain normal water level in
vessels
Replace the vessels water at every 10-15 days |
D
|
SAFETY
|
|
1
|
Fuel yard & Fuel handling
|
Depute a particular person to have
daily round to avoid fire incidents due to saturation of coal/bagasse or any
other fuel
|
2
|
Fire fighting system
|
Conduct fire fighting pumps trial
(especially Diesel fire fighter pump & Main fire fighter pump) to ensure
healthiness
|
3
|
Plant fire alarm system
|
Check Healthiness of fire alarm
systems regularly
|
Read more>>>>>Powerplant and calculations
Sir can we keep storage tanks and deaerator in dry conditions sealing all man hole doors.
ReplyDelete