SOP
FOR CHP START UP
- Ensure trained CHP operator & helper are available
- Ensure adequate illumination is available
- Ensure Operator has walky-talky for proper communication with control room
- Have field round on entire CHP & ensure all conveyors are empty & no any foreign materials on belt.
- Ensure no any maintenance or inspections are going on by other department
- Ensure all interlocks & local hooters are healthy
- Ensure shuttle conveyor discharge chute is at required position to discharge the coal
- Ensure Coal crusher twin gate is opening is as per our requirement
- Give clearance to control room for starting CHP
- Initially start Dust extraction system
- Then follow the starting sequence of shuttle conveyor & then preceding all conveyors as per system interlocks
- Ensure OBMS & magnetic separator are inline
- After ensuring all the coal handling system is healthy, then fill the grizzly hopper & start vibro-feeder (Do not start vibro-feeders if hopper is empty)
- If coal is dusty, keep ON water sprinklers
- Ensure coal belt weight is within limit by frequently communicating with control room
- During CHP running, have the field rounds for running inspections like coal spillage, gear box/motor abnormal sounds etc
Read reference books for power plant O&M
SOP
FOR CHP SHUTDOWN
- Ensure coal bunker is 90%
- Stop coal feeding
- Keep OFF water sprinkler system
- Ensure coal belt conveyors are empty & there is no any coal on belts, vibro screen & crusher
- Stop CHP as per sequence & wait for 10 minutes then stop dust extraction system
- Have field round & ensure no any coal saturation & no any abnormal observations
- Carryout house keeping
- Note down abnormalities observed during operation & take into the shift in charges & maintenance team
Pre checks:
- Ensure, operators supervising the DE system & coal handling are well trained
- Ensure proper communication of operator with control room
- Ensure coal handling, coal feeding system & DE systems are free from coal & other foreign materials Ensure there is a proper housekeeping near coal crusher, vibro screen & DE system
- Ensure all interlocks & protections systems of conveyors are healthy
- Ensure sprinklers systems provided on coal belt conveyors are healthy & can be used on immediate use Ensure coal dust collecting pipes are jam free i,e free from large size coal particles
- Ensure temperature gauge fitted at DE silo is showing normal temperature
Start up Operation:
- Start coal belt conveyors as per SOP, initially conveyors after DE systems shall be started first
- Then start RAV & vibrators, ensure both are working normal
- Then start air compressor & ensure bag filters purging SOVs are operating sequentially with preset operating & cycle time
- Start air blower & adjust suction damper, initially suction damper is kept 50% to avoid the sucking of larger sized coal particles
- Then set individual dust suction dampers of dust collecting pipes from crusher, vibro screen, and conveyor to 30-50% maximum.
- After coal feeding, check the dust expelling from chimney, if it is more, then control the blower inlet damper.
- Allow to stabilize the system Operation checks:
- Ensure RAV is running continuously
- Ensure electromagnetic vibrator fitted on bag filter housing hopper is working as per timer set
- Ensure bag filter housing temperature is normal
Pre Shutdown & shutdown checks /
activities:
- After shutdown of DE system following safety checks & activities to be carried out
- After stopping the coal feeding, keep ‘ON’ DE system for at least 10-15 minutes to ensure bag filters & housing are free from dust & coal particles
- After ensure there is no more coal falling from RAV & no dust in chimney shutdown the system safely after shutdown, ensure the dust collecting pipes are jam free
- Carryout the water washing of coal crusher house & coal belts (near crusher & DE system)
- During shutdown have a routine field rounds over crusher house, DE system & ensure temperature inside the bag filter housing is normal.